== Functional Test (FT) Procedure ==
 
<br>
 
The Software Testing Plan [https://support.d4science.org/issues/1413#change-6072 #1413] is created in the [https://i-marine.d4science.org/group/data-e-infrastructure-gateway/workspace BlueCommons VRE Folder] containing two folders: '''Material''' and '''Releases'''.
 
<br>
 
'''Material''' will contain:
 
#the [https://goo.gl/kQGSf0 general XLS template] to be instantiated by each portlet developer for compiling the Testing Plan and
 
#the portlet folder (created by '''Portal Manager''') for each portlet to be functionality tested. The syntax used to create the portlet folder
 
will be: '''''$portlet_name_folder'''''. Every developer will create the actual testing plan into '''''Material/$portlet_name_folder''''' including by adding additional files required for the test (e.g. cvs_files). To describe the functional tests, the developer will use the [https://goo.gl/kQGSf0 Portlet Testing Plan Template]; this file will be pasted and completed into the Release folders by the testers.
 
A Task ([https://support.d4science.org/projects/gcube Redmine Ticket]) will be assigned, by the '''Release Manager''', to each portlet developer.
 
<br>
 
'''Releases''' will contain a folder for each gCube release containing the tests to be executed.
 
<br>
 
FT procedure's steps are describe below:
 
*The '''pre-production infrastructure''', [https://pre.d4science.org hosted at CNR], will be used for the FT testing.
 
*The Release Manager will ask  to '''every partners''' to suggest the persons that will  form the testing team.
 
*The following '''recommendations''' should be '''mandatory''':
 
#The '''effort''' should be based not per application but per '''number of tests to be executed''' [https://support.d4science.org/issues/1413#change-6072].
 
#The tester should '''not''' be the '''same owner of the portlet'''[https://support.d4science.org/issues/1413#change-6072].
 
#For every release a wiki page will be created: '''$functional_test_master_table_Org_gCube_#Release'''(e.g. [https://wiki.gcube-system.org/gcube/FunctionalTestMasterTablegCube3.10.0 Functional Test Master Table gCube Release 3.10.0] or [https://wiki.gcube-system.org/gcube/FTMasterTablegCube4.0.0 Functional Test Master Table gCube Release 4.0.0]). The '''[[Functional Test Master Table Template|Functional Test Master Table Template]]''' will be fill by the testers with the FT results for the portlets applications in the pre-production [[#Infrastructure|infrastructure]].
 
<br>
 
<span style="color:red;">Below the NEW LINE regarding the CRT management for FT testing:</span>
 
  
The Tester can start with the FT portlets when Deployer/Infrastructure Manager updates the CRT : <code>{status: Under Integration -> Deployed on Preprod}</code>
 
In case of '''FT issues''':<br>
 
1) The Tester updates the CRT:  <code>{status: Deployed on Preprod -> FT Issue, comment: <issue description>}</code> . The comment should always include a link to a relevant log/report file.
 
<br>
 
2) After the resolution of the issue, the developer updates the CRT: <code>{status: FT Issue -> Under Itegration, comment: <issue description>}</code>.
 
<br>
 
3) The tester can repeat the FT testing and if the '''test passed''', updates the CRT: <code>{status: FT Issue -> Tested on preprod, comment: <issue description>}</code> , otherwise the step number 1) is repeated (the status return in FT Issue).
 