Difference between revisions of "Administrator's Guide: How to create a Virtual Organization"

From Gcube Wiki
Jump to: navigation, search
m
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
__NOTOC__
+
[[Category:Administrator's Guide]]
 
+
{| align="right" style="color:red; border:1px solid #aaa; background-color: #f9f9f9; padding: 5px; font-size: 95%;" cellspacing="0"
+
|+  <b>Section contents</b>
+
|-
+
|[[VO_installation|1 Installing the Virtual Organization enabling services]]
+
|-
+
|[[VO configuration|2 Configuring the Virtual Organization]]
+
|-
+
|[[Verifying the Virtual Organization correctness|3 Verifying the Virtual Organization correctness]]
+
|-
+
|[[VO Resources|4 VO Resources]]
+
|-
+
|[[VO_Services_Deployment_and_Configuration|5 VO Services Deployment and Configuration]]
+
|-
+
|[[Monitoring_the_VO|6 Monitoring the Virtual Organization]]
+
|-
+
|[[Managing_the_VO|7 Managing the Virtual Organization]]
+
|}
+
  
 
This section describes a step-by-step process for creating a new Virtual Organization (VO) within an existing [[Administrator's_Guide:How_to_set_up_a_gCube_infrastructure|gCube infrastructure]].  
 
This section describes a step-by-step process for creating a new Virtual Organization (VO) within an existing [[Administrator's_Guide:How_to_set_up_a_gCube_infrastructure|gCube infrastructure]].  
Line 24: Line 6:
  
 
* identify at least 8 machines to turn as gHNs (more machines could be needed, depending on the VO needs);
 
* identify at least 8 machines to turn as gHNs (more machines could be needed, depending on the VO needs);
* deploy and configure the [[VO_installation|VO enabling services]] on 3 gHNs. These are the mandatory services needed to glue together the VO nodes;
+
* [[VO_installation|Installing the Virtual Organization enabling services]]. 3 gHNs are needed. These are the mandatory services needed to glue together the VO nodes;
* [[VO_configuration|configure]] the VO;
+
* [[VO_configuration|Configuring the Virtual Organization]];
* [[Verifying_the_Virtual_Organization_correctness|verify]] the VO correctness;
+
* [[Verifying_the_Virtual_Organization_correctness | Verifying the Virtual Organization correctness]];
* [[VO_Resources|create and register]] the VO Resources;
+
* [[VO_Resources|Create and register VO Resources]];
* deploy and configure the [[VO_Services_Deployment_and_Configuration|VO-level services]] on 5 gHNs (eventually, other VO specific services). These services are deployed at VO level to support a specific deployment scenario;
+
* Deploy and configure the [[VO_Services_Deployment_and_Configuration|VO-level services]] on 5 gHNs (eventually, other VO specific services). These services are deployed at VO level to support a specific deployment scenario;
 
+
All the steps above  assume that a [[New_D4Science_Portal_Installation|Portal]] has been already installed, it is running at infrastructure level and can be configured to join the new VO.
+
  
The last two parts of this section describe how to monitor and manage the Virtual Organization.
+
All the steps above  assume that a Portal has been already installed, it is running at infrastructure level and can be configured to join the new VO. See the [[Administrator%27s_Guide#Portal_Management | Portal Management]] part of the Administrator's Guide for instructions on how to install and configure the portal.  
  
[[Category:gCube Administrator's Guide]]
+
After the creation of a Virtual Organisation, a number of management tasks can be performed. Refer to the [[Administrator%27s_Guide#Virtual_Organisation_Management | dedicated section of the Administrator's Guide]] for additional information.

Latest revision as of 18:44, 12 November 2013


This section describes a step-by-step process for creating a new Virtual Organization (VO) within an existing gCube infrastructure.

The creation of a VO requires to:

All the steps above assume that a Portal has been already installed, it is running at infrastructure level and can be configured to join the new VO. See the Portal Management part of the Administrator's Guide for instructions on how to install and configure the portal.

After the creation of a Virtual Organisation, a number of management tasks can be performed. Refer to the dedicated section of the Administrator's Guide for additional information.