Release Integration

From Gcube Wiki
Revision as of 08:37, 19 June 2020 by Roberto.cirillo (Talk | contribs) (Release Integration)

Jump to: navigation, search

Release Preparation

In order to integrate a new component in a gCube release, some preparatory steps (performed by the Developer) are needed:

  • Upgrade and test the component in development environment
  • Deploy the SNAPSHOT version on gcube-snapshots repository
  • Add the maven-parent 1.1.0 to the component pom



Release Integration

Once the preparation steps are completed, the integration phase can be started.

The rules to attach a component to a new gCube Release are the following ones: