Release Integration

From Gcube Wiki
Revision as of 08:52, 19 June 2020 by Roberto.cirillo (Talk | contribs) (Preliminary steps)

Jump to: navigation, search

Preliminary steps

In order to integrate a new component in a gCube release, The developer should perform some preliminary steps:

  • Upgrade and test the component in development environment
  • Deploy the SNAPSHOT version on gcube-snapshots repository
  • Add the maven-parent 1.1.0 to the component pom

Release Preparation

In order to integrate a new component in a gCube release, some preparatory steps (performed by the Developer) are needed:

Once the preparation steps are completed, the integration phase can be started.

  • After the integration phase, the component master branch must be freezed until the release will be declared closed by Release Manager.